After looking at various different tiles and debating how to update the bathroom we finally proceeded with the remodel. Ben was optimistic that this could be done over the holiday break since were both off of work but after starting and making a few changes along the way a month later were finished.
We replaced all of the original flooring (carpet and linoleum) with a brown Italian tile, replaced the white tiles around the tub with a small light brown Italian tile, Swapped out the single big mirror and light bar for two smaller mirrors and lights and gave the room a fresh coat of brown in a mocha/latte shade.
Here is a before and after photo and the rest can be found on our flickr site.
Bathroom before- carpet, white tiles around the tub, single mirror and light
Bathroom after- tile floor, new tile around tub, two mirrors and lights
No comments:
Post a Comment